Details at Carrigadrohid, including phases of construction of the dam
Tags
end_date | 1956-01 |
---|---|
end_date:edtf | 1956-01/1956-10-23 |
end_date:note | Assuming tailrace was fully complete before or at the same time as the superstructure of the power station |
end_date:source | McCarthy, Kieran and O'Donoghue, Seamus. "Generations: Memories of the Lee Hydroelectric Scheme, County Cork", pp55-56. The Lilliput Press, 2008. ISBN 978-1-84351-139-7 |
natural | water |
note | War Office map adjusted 36.48 units north on this tile so that roads line up with OSM |
source | Aerial Imagery |
source:1 | Ireland British War Office 1:25k |
source:1:date | 1940 |
source:1:name | GSGS 3906 |
source:name | Esri World Imagery (Clarity) Beta |
type | multipolygon |
water | river |
Members
1 member
- Way 200773411 as outer
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
OpenHistoricalMap is a charter project of OpenStreetMap U.S., a 501(c)(3) nonprofit organization affiliated with the OpenStreetMap Foundation. Technical development is supported by GreenInfo Network and Development Seed.
https://www.openhistoricalmap.org/copyright | https://www.openhistoricalmap.org |
OpenHistoricalMap is dedicated to the public domain except where otherwise noted. |