Way: [1957 – ] (200875427)
Version #2
Add Coolroe substation and its loop-in to the Inniscarra power line, and add moved poles to Carrigadrohid-Inniscarra line
Tags
cables | 5 |
---|---|
frequency | 50 |
note | 5 cables = 3 phases + 2 earths |
phases | 3 |
power | line |
start_date | 1957-08-21 |
start_date:edtf | 1956-04-01/1957-11-01 |
start_date:note | Both sources for start date mention River Lee - Kilbarry lines: construction started during the 1956-7 period and must have been finished by the time the 8-MW generator was commissioned at Carrigadrohid |
start_date:source | https://web.archive.org/web/20240309232643/https://esbarchives.ie/wp-content/uploads/2016/02/esb-annual-reports_1956-1957.pdf;https://web.archive.org/web/20240309232643/https://esbarchives.ie/wp-content/uploads/2016/02/esb-annual-reports_1957-1958.pdf |
voltage | 110000 |
Nodes
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
OpenHistoricalMap is a charter project of OpenStreetMap U.S., a 501(c)(3) nonprofit organization affiliated with the OpenStreetMap Foundation. Technical development is supported by GreenInfo Network and Development Seed.
https://www.openhistoricalmap.org/copyright | https://www.openhistoricalmap.org |
OpenHistoricalMap is dedicated to the public domain except where otherwise noted. |