Loading...
Way: [2003 – ] (200875428)
Version #2
Add Coolroe substation and its loop-in to the Inniscarra power line, and add moved poles to Carrigadrohid-Inniscarra line
Tags
cables | 5 |
---|---|
frequency | 50 |
note | 5 cables = 3 phases + 2 earths |
phases | 3 |
power | line |
source | Aerial Imagery |
source:name | Esri World Imagery (Clarity) Beta |
start_date | 2003 |
start_date:edtf | 2002-04-22/2012-03-29 |
start_date:note | Planning permission for expansion of the substation was granted on 2002-04-22;presumably the work was done promptly after that, but the EDTF range includes everything up to the capture date of the aerial imagery used. |
start_date:source | http://planning.corkcoco.ie/ePlan/AppFileRefDetails/02134/0 |
voltage | 110000 |
Nodes
5 nodes
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
OpenHistoricalMap is a charter project of OpenStreetMap U.S., a 501(c)(3) nonprofit organization affiliated with the OpenStreetMap Foundation. Technical development is supported by GreenInfo Network and Development Seed.
https://www.openhistoricalmap.org/copyright | https://www.openhistoricalmap.org |
OpenHistoricalMap is dedicated to the public domain except where otherwise noted. |