Way: [1968 – 2024] (201026893)
Version #2
More details on 10/20-kV line from Kyletaun to Newcastlewest / Ballingarry
Tags
cables | 3 |
---|---|
end_date | 2024-09 |
end_date:edtf | 2024-06-09/2024-12-01 |
end_date:source | survey |
fixme | Assuming substation extension coincided with building of line to Foynes, when it may actually have been much earlier |
frequency | 50 |
layer | -1 |
line | bay |
location | underground |
phases | 3 |
power | cable |
start_date | 1968 |
start_date:edtf | 1965-08-10/1971-06-18 |
start_date:source | https://www.eplanning.ie/LimerickCCC/AppFileRefDetails/65395/0;https://www.eplanning.ie/LimerickCCC/AppFileRefDetails/715045/0 |
voltage | 10000 |
Nodes
2 nodes
- 2132745051 (part of ways [1968 – 2024] (201002537), [1968 – 2024] (201002538), and 200997571)
- 2134692660 (part of way [1968 – 2024] (201145020))
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
OpenHistoricalMap is a charter project of OpenStreetMap U.S., a 501(c)(3) nonprofit organization affiliated with the OpenStreetMap Foundation. Technical development is supported by GreenInfo Network and Development Seed.
https://www.openhistoricalmap.org/copyright | https://www.openhistoricalmap.org |
OpenHistoricalMap is dedicated to the public domain except where otherwise noted. |