Loading...
Way: Utility Drive [1956 – 1964] (201107007)
Version #2
Added I-64 / I-75 and Newtown Pike Interchange
- Edited by Ben Colclough
- Changeset #178819
Tags
end_date | 1964 |
---|---|
highway | service |
name | Utility Drive |
source | Map of East Lexington |
source:date | 1959 |
source:name | USGS |
source:url | https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=bf8858e27fc5400aefac4ba38c694777 |
start_date | 1956-12-26 |
start_date:source | https://samterryskentucky.com/f/ibm-comes-to-lexington |
Nodes
2 nodes
- 2135544071 (part of ways Lexington & Newtown Turnpike [1848 – 1926] (201101212) and Newtown Pike [1926 – 1964] (201105877))
- 2135571685 (part of ways Newtown Pike [1964 – ] (201107006), [1964 – ] (201107008), [1964 – ] (201107005), Newtown Pike [1964 – ] (201106985), and Utility Drive [1956 – ] (201104305))
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
OpenHistoricalMap is a charter project of OpenStreetMap U.S., a 501(c)(3) nonprofit organization affiliated with the OpenStreetMap Foundation. Technical development is supported by GreenInfo Network and Development Seed.
https://www.openhistoricalmap.org/copyright | https://www.openhistoricalmap.org |
OpenHistoricalMap is dedicated to the public domain except where otherwise noted. |