Loading...
Way: [2002 – ] (201148125)
Version #2
Finish mapping Clashavoon - Dunmanway power line
Tags
cables | 3 |
---|---|
frequency | 50 |
note | Planning permission for Clashavoon substation was granted on 2000-10-05, and it was established by the time a planning request was filed for the 110-kV line to Boggeragh on 2004-08-23 |
phases | 3 |
power | line |
source | See sources for individual support structures |
start_date | 2002 |
start_date:edtf | 2000-10-05/2004-08-23 |
start_date:source | http://planning.corkcoco.ie/ePlan/AppFileRefDetails/002935/0;http://planning.corkcoco.ie/ePlan/AppFileRefDetails/046419/0 |
voltage | 220000 |
Nodes
4 nodes
- 2136346746 (part of ways [2002 – ] (201148127) and [2002 – ] (201148138))
- [2002 – ] (2136346135)
- [2002 – ] (2136346136)
- [1976 – ] (2136346134) (part of ways [1977 – 2002] (201148123) and [1977 – ] (201148122))
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
OpenHistoricalMap is a charter project of OpenStreetMap U.S., a 501(c)(3) nonprofit organization affiliated with the OpenStreetMap Foundation. Technical development is supported by GreenInfo Network and Development Seed.
https://www.openhistoricalmap.org/copyright | https://www.openhistoricalmap.org |