Finish 220-kV line from Tarbert to Knockraha, and add details on high-voltage side of Clashavoon substation
Tags
material | steel |
---|---|
note | Planning permission for second transformer in Clashavoon was granted on 2011-01-14, and the work was complete by the time the aerial imagery was captured on 2012-03-29 |
power | portal |
source | Aerial Imagery |
source:date | 2012-03-29 |
source:name | Esri World Imagery (Clarity) Beta |
start_date | 2011-08 |
start_date:edtf | 2011-01-14/2012-03-29 |
start_date:source | http://planning.corkcoco.ie/ePlan/AppFileRefDetails/108205/0 |
structure | lattice |
Nodes
3 nodes
- 2136346777
- 2136346778 (part of way [2011 – ] (201148141))
- 2136346779
Welcome to OpenHistoricalMap!
OpenHistoricalMap is an interactive map of the world throughout history, created by people like you and dedicated to the public domain.
OpenHistoricalMap is a charter project of OpenStreetMap U.S., a 501(c)(3) nonprofit organization affiliated with the OpenStreetMap Foundation. Technical development is supported by GreenInfo Network and Development Seed.
https://www.openhistoricalmap.org/copyright | https://www.openhistoricalmap.org |
OpenHistoricalMap is dedicated to the public domain except where otherwise noted. |