OpenHistoricalMap-Logo OpenHistoricalMap

Kiwirail Networks opened the deviation of the Main North Line between 262 and 263 km (Tunnel 21) and announced it on the 2021-05-25 on their website. A way has been added to OHM showing the closed section of track.

I’m new to OHM but have extensive experience drawing my own maps in a GIS so this is the first edit I have made to OHM.

E-Mail-Symbol Bluesky-Symbol Facebook-Symbol LinkedIn-Symbol Mastodon-Symbol Telegram-Symbol X-Symbol

Diskussioun

Aloggen fir eng Bemierkung ze schreiwen